Government & federal window film · security, blast mitigation & energy
Public buildings. Private-sector speed.
Federal, state, county and municipal facilities have the same glass problems as everyone else, plus procurement. Epic is SAM.gov registered, Texas HUB certified and on thirteen cooperative contracts — and the person who wrote our installation standard created the first blast-film attachment system used on federal buildings. Security film, blast mitigation, solar control, privacy finishes and graphics, installed by our own certified crews.
- SAM.gov registered · CAGE 8PQM0
- 100% woman-owned small business
- Texas HUB certified
- 13 cooperative purchasing contracts
Six things public buildings ask glass to do.
Pick the one on your risk register. Each links to the detail, the 3M films and the spec cards your engineer will want.
Forced entry at the public counter
Courthouses, city halls, DMVs, social-service offices and police lobbies all have one thing in common: the public meets staff through glass. 3M S2400 attached with the Epic Method keeps a broken pane in the frame long enough for a lockdown to work.
Blast and fragment hazard
Flying glass is the leading cause of injury in an explosion. Security film with a structural attachment holds fragments to the film so the glass fails as a sheet, not a spray — rated to ASTM F1642 and GSA TS01 test protocols.
Energy on an aging building stock
Single-pane and early double-pane glass on 1960s–90s federal, state and county buildings leaks heat both ways. 3M Prestige and Ceramic films reject up to 97% of infrared heat with no mirror look and no RF or Wi-Fi interference — a retrofit that fits an occupied, secure building.
Privacy without blinds in secure spaces
3M Fasara frosted and gradient finishes for interview rooms, SCIF-adjacent corridors, records rooms and conference glass. Light comes through; sightlines don’t.
Interiors that have outlived their finishes
3M DI-NOC architectural finishes over existing walls, elevator cabs, doors and casework — a refresh with no demolition, no outage and a Class A fire rating.
Wayfinding and agency identity
Window, wall and floor graphics for public buildings: directional systems, seal and agency branding, frosted privacy with a message, and campaign graphics that come off clean.
Four ways onto the purchase order.
SAM.gov registered
CAGE 8PQM0 · UEI T121WAF1WGM3. 100% woman-owned small business. Epic bids as prime on set-aside solicitations and subs to primes on larger task orders.
Cooperative contracts
Thirteen cooperative purchasing contracts — TIPS, BuyBoard, Choice Partners, PCA, Equalis and the Texas ESC co-ops — most of them open to cities, counties, state agencies and universities, not only schools. Buy at the awarded price with no RFP cycle.
Texas HUB certified
Epic Solar Control, LLC is a certified Historically Underutilized Business with the Texas Comptroller. State agencies and universities get HUB-utilization credit on every dollar.
Direct quote, written scope
For projects under your purchasing threshold: a glass survey, an opening-by-opening scope and a fixed written price — usually inside a week.
Named work, not adjectives.
- U.S. Space Force — Cheyenne Mountain Space Force Station, Colorado Springs: solar-control and security window film across the station’s buildings, awarded 2026.
- Cherry Creek Schools, Colorado: 89 campuses, ~50,000 windows, 600,000+ sq ft of 3M S2400 — the largest school security window film project in U.S. history, for a public district that ran a competitive forced-entry evaluation before awarding.
- Oklahoma Department of Wildlife Conservation, Oklahoma City: 3M window film for a state agency headquarters; customer testimonial on file.
- Texas public school districts — Killeen, Burleson, Jacksonville, Anna, Godley, Farmersville and more — purchased through cooperative contracts, with reference letters from their police chiefs and safety directors on our References page.
- Spec cards for every 3M security and solar film are in the download library.
- Independent testing: 3M S2400 installed with the Epic Method, tested to ASTM F3561 Method A at Intertek — reported as data for specifiers, not as a compliance claim.
Epic reference packet
Seven district letters, the 3M authorization letter, the Accent distributor reference and the Texas HUB certificate — 15 pages for evaluators.
The Retrofit Gap — ASTM F3561 position statement
What the Intertek test showed, what the standard was written for, and what Epic does and does not claim.
Not just anybody gets selected to work on the White House — or an embassy in Kazakhstan.
Before Epic, Chris Eder’s company was the one the federal government and the State Department called when the glass had to hold: the White House and the Smithsonian, every EPA facility across the nation including the entire Federal Triangle, agency headquarters throughout Washington, and complete U.S. embassies and ambassadors’ residences on three continents — Rome, Malta, Luxembourg, the Vatican, Kazakhstan. The buildings named below are a sample, not the list. It is why a school district or a building owner can trust the same hands and the same standard today.




Diplomatic & executive
- The White House
- U.S. Department of State
- U.S. Embassy, Rome
- U.S. Embassy, Malta
- U.S. Embassy & residences, Kazakhstan
- American Consulate, Florence
- Ambassador’s Residence, Vatican City
- Ambassador’s Residence, Luxembourg
- Villa Taverna, Rome
- Amerika Haus, Frankfurt
Federal Washington, D.C.
- EPA — every facility nationwide, incl. the Federal Triangle
- Internal Revenue Service
- Department of Commerce
- Department of the Interior
- Housing and Urban Development
- Office of Personnel Management
- E. Barrett Prettyman Federal Courthouse
- Walter Reed Army Hospital
- Watergate Complex
- Metro Building
- Inter-American Development Bank
Smithsonian & cultural
- National Air and Space Museum
- National Museum of Natural History
- Hirshhorn Museum
- Arthur M. Sackler Gallery
- National Museum of African Art
Military & commercial
- Sheppard Air Force Base
- Tyndall Air Force Base
- Defense Language Institute, Presidio of Monterey
- Fountain Place, Dallas
Pre-Epic federal, diplomatic, cultural and military work was performed by Chris Eder as an owner of a prior company. It is presented as founder history that carries into Epic’s installation standard, not as Epic project experience.
Payback figures your budget office can check.
Epic runs every 3M film against your building’s glass, orientation, HVAC and utility rate and ranks them by savings and payback — the number a capital request needs.
Government & federal window film questions
Is Epic registered to do business with the federal government?
Can a city, county or state agency buy from Epic without a bid?
What blast standard does security film meet?
Can you work in an occupied, secure facility?
Is security window film bulletproof?
Do you serve facilities outside Texas and Colorado?
Request a facility assessment
Agency, facility and the problem — security, blast, energy, privacy or finishes. A Solutions Advisor replies within one business day with the contract vehicles you can use and a survey date.
Three ways in. Pick the one that fits today.
Request a free assessment
On-site survey, film recommendation, written estimate. No obligation.
Download a spec card or guide
Nine Epic spec cards, the Epic Method sheet, and the buyer’s guide — free.
Talk to a Solutions Advisor
866.EPIC.117 · Monday–Friday 8–5 Central. A person, not a phone tree.
Follow the work
Real installs, real tests, real schools. Pick the feed you actually open — same crew, same standard everywhere.